
PRE-HOISTING CHECKLIST
This checklist must be checked prior to each use of the PRO Drive. This checklist is to be used as a guideline in
conjunction with the maintenance and inspection procedures outlined in this manual. The PRO Drive and related
equipment must be thoroughly inspected prior to each use by a trained person. A trained person is one who has read and
thoroughly understands this instruction manual and related equipment manuals and, through training and experience, has
shown knowledge regarding the safe operational procedures. If you do not have such a person in your organization,
please contact Reimann & Georger Corporation or its distributors and they will assist you in providing such a “trained
person.” Do not permit any person who is not fully trained to operate this PRO Drive. It is recommended that this
checklist be maintained as a permanent record.
Discuss work plan, personal protective equipment, and each crew member’s responsibility before starting to set-up.
Insure OSHA compliant fall protection is in place.
Insure hoisting operation will clear all power lines and obstructions.
Insure hoisting area is secured from all unauthorized personnel.
Insure the track is securely tied to the roof to prevent track from slipping.
Insure that both track shoes are resting on a firm level surface and both PRO Drive wheels are 3/8” off surface to
prevent track slippage or uneven loading.
Insure the load does not exceed the rated load capacity of the hoist model being used.
Insure all structural members of the PRO Drive are free of defects and damage that may affect the integrity of the
PRO Drive.
Insure brake rope is not wet.
Inspect wire rope for signs of wear and damage. Replace defective wire rope immediately.
Insure that at least three wraps of wire rope are on the winch drum at maximum travel.
Insure that the screw securing wire rope end loop to the brake sheave is tight and in good condition.
Insure wire rope is reeved properly for either one (1) part of line for the PRO200 hoist or two (2) parts of line for
the PRO400 hoist.
Insure that track support has been properly installed for track lengths over 28 feet.
Insure that the bottom of the track is away from the building 1/4 of the supported height plus the building overhang.
Insure that all bolts and nuts are tightened securely.
Insure all sheaves can rotate freely.
Insure safety latch on the hook does not support any load.
Insure PRO Drive has been properly maintained.
Operate hoist with no load to test hoisting operation, controls, and PRO Drive.
INSPECTOR: _____________________________________ DATE: ______________
Comentários a estes Manuais